Sunday 28 September 2014

WEEK 16

Title: Discuss with Supervisor.


Objective: Step Needed to Start


Content/Procedure:
When the new semester was open after semester break almost 3 month, I have go to see my supervisor, Sir Mohd Akram Dandu and making some little discussion.


Result: After discussion with supervisor, I have know what the first step need to do for my Final Year Project 2 (FYP 2).


Conclusion: Hopefully, I can do the my project very well by following the timeline given.

Friday 26 September 2014

WEEK 15

Title:
Attend to the seminar National Instrument.

Objectives :
Seminar are learn about design real systems fast with NI myRIO hands on Workshop.

Content / Procedure :
Understand and use each function myRio how to use them. The myRIO is a device that makes it easy for students to do a project in one semester. It is the same as in the laboratory, but this is very easily programmed based on the LabVIEW understanding.











Conclusion :

Expect to use and it's very easy to enable the students in each semester of the project such as robotic.

Monday 22 September 2014

WEEK 14

Title:
Update Proposal  and blog.


Objectives :

To describe a process for completing this project and to ensure blog and proposal is in order and also completed.


Content / Procedure :

Updated proposal by title required by the prescribed format and blog by date and activity performed each week.


Result and Analysis :

Proposal to be completed within the specified time in the format of Final Year Project committee propose REFER on website UNiKL fyp and blog can be produced to order according to activity performed each week.


Conclusion :


Both this report can be done and completed as well and done and submit to supervisor. 

WEEK 13

Title:

Discuss about project with supervisor.

Objectives:
To get a lot of information to produce a good project performance.

Content / Procedure:

Meet supervisors.
Talk about the important parts, the way to create this project and time management to ensure the project is completed within the stipulated time.
Exchange ideas and knowledge to ensure the success of this project as planned.

Result and Analysis:

Supervisor provides suggestions to start this project from scratch. For starters, must to construct the first part which is hardware interfacing and pay attention to the important parts such as windbelt and the basic component required in this project.


Conclusion:
A lot of ideas were shared to ensure the success of this project.

Accept all ideas and information provided by supervisors to ensure the smooth running of the project construction and strive for success.

WEEK 12

Title: Project Proposal

Objective: Draft Project Proposal

Content/Procedure:

For this week, I need start do the project proposal for my project. Before submitted the project proposal, firstly I must do project proposal draft based on the guideline and format below:


Title Page
Abstract
Table of Contents
Introduction
Problem Statement
Literature Review
Methodology
Objectives
 Benefits / Contributions
 Work Plan
 Budget
 Conclusion
References

Result:
With the format guideline given, I can do the complete and proper for my project proposal.


Conclusion: I have success do the project proposal with this guideline given.

Tuesday 16 September 2014

WEEK 11

Title: Project Budget Estimation

Objective: To known the Budget for This Project

Content/Procedure:

After doing estimation, here the list of budget for this project:-




Result: I have known how much to develop this project and I need to prepare early for this project budget.

Conclusion: The estimation cost or budget very important to researcher when they develop or create some project.