Tuesday 20 May 2014

WEEK 10


Title: Do the Slide Show for Presentation

Objective: For FYP 1 Presentation 

Content/Procedure:
By using the microsoft powerpoint, I do the slide show by follow the guideline that given. I use the draft project proposal as data for slide show presentation.















Conclusion:

I hope I can do the best for my presentation for  this week.  During the presentation day, the assessors is Ms Fatimah Binti Hamidon and Mr Ahmad Zaki Bin Abdul Karim will assess for the FYP proposal. Hope goes smoothly and succeed.


Sunday 18 May 2014

WEEK 9

Title: Flow Chart & Gantt Chart Project

Objective: Project Operation Flow & Project Guideline


Content/Procedure:

Figure shown the flow chart about operation for this project and also the timeline to finish this project.

Result:


Firstly is the flow chart about principle operation this project that shown below:


Besides that, the gantt chart is needed for this project as a guidelines. This because with the gantt chart my project will flow systematic. Figure below shown my gantt chart:




Conclusion:

Flow chart can make me more understand about this project especially the operation. For the gantt chart, it as the direction or guideline to me to do this project with systematic. Each plan is very important to show each development project.

Wednesday 14 May 2014

WEEK 8

Title : Identify the Components Use


Objective : Material to Develop this Project


Content/Procedure :

So, after research about my project and known how the operation, I should investigate and identify what the components needed in my project.


Result :


List of below is roughly component that uses for this project and not very specific:-



Conclusion : 

After identifying the material and components to be used and hope to build and assemble all of these materials to a successful

WEEK 7

Title : Introduction of Project

Objective : Project Principle Operation

Content/Procedure :

This project is to design the prototype of Hybrid Wind-Belt Generation System for Rural Electrification by combining the solar power system with wind generator(windbelt) system that can charge the 12V battery storage and can be reused as power supply for any appliances.
This project is to develop new technique electric generation based on the combination of two hybrid energy resources ( i.e. PV and Wind) for rural electric consumers.

Result : 

The block diagram below show the operation of this project:-





Conclusion :


The block diagram above function is to identify and investigate the function of each part of the block in order to make it easier to recognize the project operation.